Place the O Ring over the RSPT or slip piece of duct and slide into desired position. The O Ring forms part of the Rolled Edge connection and can be clamped together using an RE Clamp.
Install Notes:
- Place O ring Over Slip Duct
- Push the Slip duct inside the main pipe to desired position.
- Push the O Ring next to the main pipes nipple.
- Use an RE Clamp to secure them together.
Please note that O Rings are supplied free with all Rolled Edge Telescopic Pipe.
****Delivery can take up to 3 to 4 days from next the working day after the order has been placed****